Concrete Pile

Pre-cast pre-stressed concrete piles are commonly used in the pile market. We drive concrete piles on more than ninety percent of our jobs. The pre-cast pile is one of the most cost effective pile types due to material cost, custom pile lengths, and availability. Recently we had involved in Pile Jack-In Technology which using Hydraulic Jack-In Machine.
  • The cost of concrete pile varies based on design loads, dimensions, and length, but typically a concrete pile is more cost effective.

  • After the completion of an indicator program pile lengths can be customized to site specific soil conditions prior to ordering production pile avoiding costly material waste.

  • Concrete piles can be ready to drive in most cases in fourteen days, as opposed to steel piles which can require a mill rolling taking six to eight weeks.